Shandong China Coal Mucking Machine Co., Ltd.

Shandong China Coal Mucking Machine Co., Ltd.

Position: Home » Industry Info » The Operation Process Of The Rock Mucking Loader Used In Underground Shafts

The Operation Process Of The Rock Mucking Loader Used In Underground Shafts

Rake bucket rock mucking loading machine: The slag loader commonly used in tunnel shafts is also called bucket loader rock loader, which is now replaced by bucket rock mucking loader. It is required to be small in proportion, reliable and durable, easy to operate, free to walk, high in production efficiency, continuous non-intermittent operation, and safe and environmentally friendly.

The slag rock mucking loader has three traveling modes: wheel belt type; track type; and chain track type. According to the bucket type of the slag mucking machine,, it can be divided into four types: bucket type; crab claw type; vertical claw type; bucket type. The first three are gently eliminated and replaced by the bucket type in the construction practice.

Operation Regulations of Slag Rock Mucking Loading Machine

1. It is necessary to hold a valid certificate to work, read the homework regulations carefully, and control the bucket rock mucking loader to adopt safety measures.

2. Inspect the work site and carry out knocking on the top, choosing a firm and reliable hanging pulley guide support point.

3. Check whether the components, systems, and barriers of the bucket rock loader are basically complete and meet the requirements.

The Operation Process Of The Rock Mucking Loader Used In Underground Shafts

4. All personnel are evacuated to a safe place behind the bucket mucking machine.

5. It is not allowed to tighten the two handles at the same time during normal shipment to prevent the rake from flying up.

6. The difference between the delivery of the rake bucket and the working surface is generally 5-20 meters, and the rake bucket is not allowed to hang pulleys on the support.

7. When the bucket mucking machine fails during the operation process, it must be shut down, opened and closed for processing.

8. The driver should pay attention to the operating conditions of all parts of the machine at any time, and should stop the machine for inspection and handling if an abnormality is found.

9.the mobile rock mucking loading machine operating procedures: open the track clamp-lay out the cable-transmission signal-tow the belt movement-pull to the pre-designated fixed.

10. After the work is over, put the handle of the rake bucket to the coordinate of the brake release, block the power of the mucking machine, turn on the zero position to lock the switch, and report the operating status of the machine to the successor.

The Operation Process Of The Rock Mucking Loader Used In Underground Shafts

skype sail Online Email:sales@chinacoalintl.com
menu
Home Products Top

+

+

Please leave a message


sales@chinacoalintl.com