Introduction Of Mucking Loader

This report elaborates on the development Prospects of mucking machine from the development of international bucket electric rock loader, policy environment and development of domestic bucket electric rock loader,  import and export situation, key production enterprises, existing problems and countermeasures. And based on this, made a scientific prediction on the development prospect of the bucket type electric rock loader. Finally, the investment potential of the bucket type electric rock loader was analyzed.

Safety Operating procedures:

1. Check the power supply switch before driving, whether the cable is intact, whether there is leakage or not, and confirm the safety before driving.
2. Strictly knock the top of the question before the operation, handle the net top to help the pumice, and pay attention to the observation at any time. If the situation is critical, evacuate immediately.
3. Wear insulated gloves and insulated boots (stay intact) when loading rock, choose a reasonable position, the driver's back clearance is not less than 40cm, against blind and dry. The head and feet must not be found in the scope of the bucket. It is forbidden to operate a rock loader at the same time
4. Within the scope of rock loading work, other unrelated personnel are forbidden to enter. When the work needs to enter the work surface, it must wait until the rock load machine stops before entering.

The regulations must be observed when loading the rocker:

1. The bucket should be prevented from being inserted into the pile of rock (rock) and should be quasi-steady when moving forward.

2. Lifting and retreating should be smooth, avoiding excessive force and flying stones to injure people. When the bucket is filled with ore, it is not allowed to stop at any angle in space.

3. When encountering large rocks, clean up the waste rock and debris on both sides, and do not blindly shovel large blocks. If there is a pit in the rock pile, first install the rock mine and then treat the pit wood. It is forbidden to use the rock loader hard shovel. wood.

4. When manually cleaning the rock mine in front, the rock loader must be stopped and the power supply must be cut off.

5. When connecting the car and dialing the pin, you must wait until the rocker is stopped before proceeding.

6. After the rocker has been dropped, special railers or squares must be used. It is forbidden to use rock ore blocks.