NOTICE:
When the bucket loader is working, the mine car is hung at the rear. As shown in the middle double-dotted line, the bucket is lowered 1 to 1.5 m away from the rock pile, the travel motor is started, and the traveling mechanism is moved forward. The forward momentum of the machine, insert the bucket into the rock pile, then start the lift motor, so that the bucket is inserted into the rock pile and lifted until it is filled with the bucket. The steering motor (or the running mechanism) is operated in reverse, and the machine retreats to the rock. The stack stops at 1 to 1.5 m. At this time, the bucket is continuously lifted, and the bucket 3 is rolled along the guide rails on both sides of the swing base 4 until the bucket is turned to the end position of the bucket loader to collide with the buffer spring to make the bucket The rock inside is thrown out by inertia and loaded into the mine car behind the bucket loader. At the same time, the lift motor is turned off, and the bucket returns to its original lowest position by its own weight and the reaction force of the recoil spring.