NOTICE:
The method of adjusting the tension of the track
(1) A flat bar is placed on the top of the carrier and the guide wheel to measure the lower deflection of the track.
(2) Use a special wrench to turn the adjusting nut in the tension buffer device to make the track tensioned.
(3) The tension of the track shoes on both sides should be adjusted
Measures to extend the life of the track
(1) Tracking in time toreduce the unloading distance.
(2) Strictly control the number of loaded mine vehicles at a time.
(3) Eliminate the accumulated water in the working face in time.
(4) Before each shift, rinse with water or use a hammer to crush the block deposits in the track.
(5) Tighten the track shoes and fix the bolts.
Two methods of resetting the track of the side inclined rock loader off the rail
(1) Put the track connection to the live pin, flatten the track, adjust the orientation of the loader to match the track, then zero the control switch and lock it, then reinstall and reset the track. During the installation process, the driver must be staffed by qualified personnel and concentrate. On-site, the team leader unified command and installation of the entire process of re-railing. In the work, you must be equipped with manpower, shouting and concentrating, in order to prevent the big chain from biting your hands and feet.
(2) Using human assistance, relying on its own power to re-orbit. In the work, after the sidetracking track is reset to a certain level by manpower and hammering, the driver clicks the running mechanism of the side to perform resetting. At work, the driver must be a person with a certificate. The on-site command was unified by the team leader and the construction workers were concentrated. When the manpower is re-tracked, the equipment must be powered off and locked. Only after all the construction personnel have been evacuated to a safe position, the team leader can command the driver to jog the equipment for re-tracking.