NOTICE:
What is the preparation of the rock mucking loader before operation? Now let me know:
1. Knock on the top and clean up the working environment to remove the top gangue.
2. Sprinkle water and wash the roof of the coal gangue or pile before the rock mucking loader (Mucking Machine) operation.
3. Install fixed wedge and hang tail wheel. The working face is 800-1000 mm higher than the rock mucking loader (Mucking Machine) pile. The number of eyes is determined by the width of the roadway. The distance between the eyes is about 1 m. The depth of the eyes should be 50-100 mm longer than the wedge, and the angle of inclination should be 5-10 degrees downward. After the wedge hole is drilled, the pneumatic drill, electric coal drill and air water pipeline shall be evacuated to the working face. Firstly, place the wedge in the eye, then insert the wedge, and then hammer it. First, the tail wheel is hung in the wedge ring in the middle to prepare the rock in the middle of the rock mucking loader (Mucking Machine) stack.
4. Check whether the guide wheel and tail wheel suspension are correct and safe. Whether the pulley rotates flexibly, the wire rope is worn out or broken is beyond the stipulation, arranged neatly on the drum, and the brake band is tightened properly.
5. Check that the rail clamping device is firm and reliable, and the driver's operating side is not less than 700 mm away from the roadway wall.
The above is about the introduction of rock mucking loader, friendship tips: check whether the lubrication parts are appropriate oil, no leakage phenomenon, electrical equipment when there is water, should be properly covered on the roof.