NOTICE:
The rock mucking loader is an indispensable machine in the coal mine construction operation. It can be loaded with ore or rock, which is flexible and reliable, and has high rock-loading productivity. It is suitable for geological exploration tunnels.
Then, friends know how to properly stop the work process of the tunnel mucking machine during the operation?
First, Level the bucket and stop the tunnel mucking machine horizontally. When working on a slope, the tunnel mucking machine should be placed in a slant-crossing state relative to the roadway (the bucket is facing the side of the roadway), and then the caterpillar track should be padded with a special pre-prepared tine block.
Then,Power off the tunnel mucking machine, release system pressure (hydraulic system of working mechanism relieves pressure by operating multi-way reversing valve).