NOTICE:
1. The new technology of rock mucking loader is of high efficiency. It used to be man-made loading of rock. Now it has been changed to mechanical loading, which increases work efficiency by more than four times and reduces the number of front-line workers by at least three. It has greatly accelerated the speed of development. In the past, the maximum footage of rock mucking loader machine was 70 meters per month, and now it can be 100 meters per month. The use of new technology and new equipment has greatly improved the speed of development. Mining mechanization level;
2. Mucking loading machine is divided into claw type, crab claw type, bucket type and rake type according to its working principle, and is driven by electric, pneumatic and diesel engines according to the power used. Geological prospecting type 1A track rock loader has the same structure as bucket type, and is suitable for use in geological prospecting tunnels.
3. When the commonly used rock mucking loader works, the fuselage moves forward, the bucket drops down and inserts into the rock pile, and then lifts the bucket and the fuselage retreats. The bucket overturns the rock loader in the mine car or other reloading equipment hanging behind the fuselage. Its work is more flexible and reliable, and the rock loading productivity is higher. It is widely used loading equipment at home and abroad.