NOTICE:
(1) When moving the tunnel mucking machine down the mountain, fix the main lifting rope and the trolley connecting device firmly, and tighten the lifting rope.
(2) Remove the four-barrel machine root stabilizer device.
(3) Remove the lower rail clamp and the upper rail clamp of the bucket machine, and check that everything is firm and correct before sending a signal to drive down.
(4) When moving the tunnel mucking machine, no one should stay in front or behind, and the winch should be lowered to the desired position at a slow speed.
(5) After the move is completed, it must be executed in accordance with Article 5 of Uphill Movement and Installation.
(6) In the construction of the downhill, 5-10 meters away from the rear of the bucket machine, tighten the firm and reliable flexible car block.
The movement of the tunnel mucking machine is relatively easy to move than the inclined lane. Perhaps it is because there are two situations in the process of moving the inclined lane. There are many things to be aware of, but no matter what kind of movement of the rock loader, we keep a close eye on their workflow so that they can get the job done.