NOTICE:
If you pay close attention to our information, I believe you have a certain understanding of electric rock mucking loading machine. Today I will tell you about the main operating procedures of electric rock mucking loading machine.
1. The electric rock mucking loader bucket is lowered to the bottom position. The machine moves the rock toward the working surface. Before starting the rock loading, the rock loader is parked at a distance of 1 to 1.5 meters from the rock pile and the bucket is lowered to the bottom position. Then press the forward button and drive the rock loader forward until the bucket is in the rock pile;
2. Lift the bucket to unload the rock mucking loader machine loaded rocks into the mine truck. After the bucket is filled with rocks, press the lift button on the upper left hand to start the lift motor and lift the bucket to unload the loaded rocks into the mine truck. After the bucket is unloaded, it will automatically fall to the original bottom position by the recoil of the buffer spring and the self-weight of the bucket itself;
3. The electric rock loading machine is far away from the working surface and ready for the second loading.
Speaking of the operation process of electric rock mucking loading machine, do you know it here? If you have any questions, please call our staff, we will have a professional to explain to you, until you are satisfied. We wholeheartedly look forward to your arrival.