NOTICE:

Shandong China Coal Mucking Machine Co., Ltd. mainly produce mining equipment, such as mucking machine, rock loader, Mucking loader, Rock Mucking Loader, Tunnel Mucking Machine, Mucking Loading Machin
China Coal
Home>Details

Safety Measures Of Bucket Tunnel Mucking Machine In The Transitional Period

In order to ensure the safety of the bucket rock mucking loading machine during the transition period, corresponding countermeasures should be taken when using:

1. Before using the bucket tunnel mucking machine, the mechanical and electrical integrity and explosion-proof inspection must be carried out by the electromechanical group of the production department and the safety supervision department. It can be used only after passing the inspection, and it is used and managed in strict accordance with the "Operation Regulations" and maintenance requirements during use.

Safety Measures Of Bucket Tunnel Mucking Machine In The Transitional Period

2, the bucket driver must check the wire rope and safety devices before starting the operation of the bucket mucking machine in each shift, and start the operation after confirming that they are correct.

3. The brake device of the bucket mucking machine must be complete and reliable, and meet the requirements of intact standards, and the rail clamp must be complete and intact, and firmly stuck on the track. The wire rope of the bucket mucking machine must not be knotted, and all pulleys must be intact and flexible. The excavation team shall send personnel to check the integrity at least once a week, and make corresponding records for future reference.

CONTACT US

Telephone : +86-18660761375

Fax : +86-537-2486099

Address : No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China