NOTICE:
Electric mucking loading machine is a light-duty loading equipment for rail-wheel type underground tunneling and stope. It has compact structure, strong adaptability, reliable work, simple operation and maintenance. It can load general rock, gravel, iron ore, gold ore, granite and other metal or non-metal mines with high loading efficiency. It is suitable for all kinds of mines. The horizontal roadway (gradient ≤8°). Today we take a look at the preparatory work before the application of the rock mucking loading machine.
1. Remove the dust falling on the fuselage
2. Check tunnel mucking machine that the oil level of the gearbox of the mechanical moving mechanism and the bucket promotion mechanism shall not be lower than the inspection hole 20-30mm
3. Check whether the chain and spring are reliable.
4. Check the rock mucking loading machine tension of the stabilizer spring and the fixed state of the damping spring.
5. Whether the mucking loading machine pivot connecting the moving part and the circling part seat plate is tightened, and whether the pin of the pivot is lost.
6. Check the tunnel mucking machine condition of the cables leading to the machine.
7. Check the tunnel mucking machine control box switch