NOTICE:
If you often pay attention to our information, I believe you have a certain understanding of the electric rock mucking loader, today I will give you the main operating procedures of the electric tunnel mucking machine rock loading.
1. Electric mucking machine bucket down to the bottom position, the mucking machine to the work surface movement of rock loading, start to load rock before the rock loader stop at 1-1.5 meters from the rock pile, the bucket down to the bottom position. Then press the forward button and drive the rock loader forward until the bucket is cut into the rock pile.
2. Lift the tunnel mucking machine bucket to unload the loaded rock into the mine car. After the bucket is filled with rock, press the shovel button above the left hand to start the shovel motor and lift the bucket to unload the loaded rock into the mine car, the bucket will automatically fall to the original bottom position after unloading by the recoil of the buffer spring and the self-weight of the bucket itself.
3.The electric rock mucking loader is far away from the working face and ready for secondary rock loading.
Do you understand the operation process of the electric tunnel mucking machine? If you still have any questions, welcome to call our staff, we will have professionals to explain to you until you are satisfied. We are looking forward to hearing from you.