NOTICE:
1. Carefully observe and check the whole rock-loading equipment machine between the various parts of the connection line connection through the operation and other rock-loading electrical equipment between the various parts of the wiring connection through the operation and whether the working condition is good, to observe the whole rock-loading tunnel rock-loading machine blasting after the work, check the whole paving rock-loading rail rock-loading track or set the direction of the correct track, paving the rock-loading track length or spacing set up whether the completely fixed enough to be sure that the paving rail track sidewalls do not have any safety problems before they can begin to rock-loading operations.
2. When loading rock, the driver found that the body inside the location of the side wall is not maneuverable side, rock loading machine and the entire rock loading roadway rock loading machine side wall joints connecting line distance of at least a minimum of 300mm or more, so as not to cause the side wall of the roadway extrusion rupture damage to the driver driving the rock loading machine.
3. Inspection, oiling and manual shutdown repair people in the use of various rock loading machine, must be strictly stipulated in advance of its use of various rock loading machine of all major components must be maintained in a completely stable and normal working condition, is strictly prohibited in a rock loading bucket machine normal work automatically shut down for routine inspection or oiling or manually clean up any kind of rock dust.
4. If you find that the mucking machine needs to reopen the protective cover on the automatic parking maneuvering box in time when you need to carry out vehicle inspection and power maintenance, you must first manually cut off the power supply of the vehicle inspection, and then automatically cut off the power supply of the vehicle inspection relay to carry out the inspection inspection, and confirm that the power supply of the inspection of the vehicle is completely disconnected before you can begin to carry out the inspection and maintenance of mucking machine in a normal and reliable manner.
5. In the normal operation of mobile vehicles traveling in the process, such as found that the vehicle has occurred in any vehicle failure should be immediately requested to suspend the automatic parking, to identify the causes of vehicle failures and timely after-sales service repairs to the mucking machine, in all may have been found in any vehicle failure has not yet been completely eliminated before and after the basic can not be requested to stop the parking to continue to leave the vehicle normally or for normal use.
6. The roadway shall be in full compliance with the standard specifications, straight and completely free of open gangs and bottom lines. If it does not fully meet the standard specifications, it shall be reworked immediately.