NOTICE:

Shandong China Coal Mucking Machine Co., Ltd. mainly produce mining equipment, such as mucking machine, rock loader, Mucking loader, Rock Mucking Loader, Tunnel Mucking Machine, Mucking Loading Machin
China Coal
Home>Details

Five Preparations for Electric Rock Loader before Start-up

The five preparations before the start of the electric rock mucking loader are indispensable and are very important. Let's take a look at it together.

1. Check that the rail rail is fast and reliable. The side of the driver's operation is not less than 700mm from the lane wall.

2. Sprinkle water and flush the top of the rock mucking loading machine or coal pile before the operation of the bucket rock loader (coal machine).

3. Knock on the top of the rock mucking loading machine and clean up the working environment to remove the top work.

4. Check whether the lubricating parts are properly oiled and there is no leakage. When the electrical equipment is drenched, it should be properly covered on the ceiling.

5. Check the guide wheel of the electric rock mucking loader. The tail wheel suspension is correct, safe and secure. The pulley rotates flexibly, the wire rope is worn, and the broken wire exceeds the regulation. It is arranged neatly on the drum, and the brake band is tightly tight.

CONTACT US

Telephone : +86-18660761375

Fax : +86-537-2486099

Address : No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China