NOTICE:
Introduce what we do before the tunnel mucking loader is turned on:
1. Sprinkle water and scouring the top of the rock or coal pile before the operation of the bucket rock (coal machine).
2. knock on the top of the question, clean up the operating environment to remove the top of the work.
3. Check the guide wheel. The tail wheel suspension is correct and safe. The pulley is rolled and lapped, the wire rope is worn, and the broken wire is beyond the rule. The roller is placed on the drum and the brake band is properly tightened.
4. Set up the fixed wedge and hang the tail wheel. The working surface is higher than the tunnel muckin machine (coal) pile 800~1000mm, the wedge eye is selected, the number of eyes depends on the width of the roadway, the eye distance is about 1m, the eye depth should be 50~100mm longer than the wedge, and the downward angle is 5°~10°. inclination. After the wedge eye is laid, evacuate the air drill or electric coal drill and feng shui pipe to the working surface. First place the wedge in the eye, then puncture the tight wedge and then use a hammer to tighten. First, hang the tail wheel in the middle of the wedge ring to prepare the rock mucking loader in the middle of the piled rock (coal) machine.
5. Check whether the lubricating parts are properly oiled and there is no leakage. When the electrical equipment is drenched, it should be properly concealed on the ceiling.
6. Check that the rail clamp is firmly fastened, and the side wall of the driver's operation side is not less than 700mm.