NOTICE:
In some special cases, can the driver of tunnel muacking machine operate freely? Of course, this is not possible. What are the requirements? Xiaobian tells you here.
1. When moving the mucking loader in the laneway, it is necessary to loosen the rail clamp, tidy up the cables, and then move with self-traction, so that the traction speed should be uniform and not too fast. If the winch is used for traction, a signal device shall be provided and a special person shall be designated to send the signal. After the roak mucking loader is moved to a predetermined position, the machine should be fixed.
2. Before moving the tunnel mucking loader, the rocks around the rock loader should be cleared, the track should be laid, the dustpan mouth of the rake-loader should be lifted and hooked by nose, and the small doors on both sides should be closed inward. Reliable safety measures must be taken to prevent the rake-loader from falling over when moving.
3. The fixing of the mucking loading machine must be clearly stipulated in the operation regulations and strictly implemented.
If you want to know more about rock loader, you can call at any time to consult or pay attention to our website information. We warmly welcome friends from all walks of life to discuss cooperation and win-win development.