NOTICE:

Shandong China Coal Mucking Machine Co., Ltd. mainly produce mining equipment, such as mucking machine, rock loader, Mucking loader, Rock Mucking Loader, Tunnel Mucking Machine, Mucking Loading Machin
China Coal
Home>Details

The Driver Of The Rock Loader Knows How To Work

The driver master who has been in contact with the tunnel mucking machine, for a long time must be the driver's requirements in various standards for the operation of the rock loader. For the driver, the work aspects are reflected in the work.

1. Check whether the support near the working surface and the empty top distance of the socket head are cleaned up.
2. Check the quality of the track, including whether the gauge, plywood and turnout meet the standards.
3. Check whether all parts of the rock loading machine are intact and the connecting bolts are complete and fastened.
4. Check whether the cable suspension is straight and damaged, whether the mopping cable is intact and there are no obstacles.
5. Install the fixed wedge, register the tail wheel, check the guide wheel, tail wheel, wire rope, rail clamp and other problems, open the lock, send the start signal, after the personnel withdraw to a safe place, open the car for trial operation.
6. After the trial operation is normal, start the raking operation. Pay attention to the operation status of the rock loading machine at any time during the raking. When the raking bucket is blocked, do not forcibly pull the raking bucket. You should withdraw from it for 1 to 2 meters and re-rake or rake back to prevent Broken rope or burned motor. When the electrical or mechanical parts of the rock rig are overheated, the operation sound is abnormal or there is strong vibration, the machine must be stopped immediately and the power supply must be cut off for processing.
7. After the tunnel mucking machine raking is completed, take off the tail wheel and hang it on the rock loading machine. Open the bucket to the rock loading machine. Put the operator's handle in the release position. Turn off the raking machine, cut off the power lock switch, and remove the operating handle. . After cleaning and inspecting the equipment, prepare to take over the shift.

We should pay more attention to these tasks in our daily work. Of course, in addition to the main driver, the work of other personnel is also very important. Only by cooperating with each other can the use of the tunnel mucking machine be better. 

CONTACT US

Telephone : +86-18660761375

Fax : +86-537-2486099

Address : No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China