NOTICE:
Mucking Loading Machine For ore bodies covering rocks larger than 3m, shallow wells should be used. Trenches and shallow pits are available for ore bodies covering rocks within 3m. The quality of drilling engineering shall meet the requirements of relevant regulations for drilling operations. The core, roof and floor are within 5m of each other, and the probability of adoption of the marker layer, rock and full-hole core cannot be lower than the relevant regulations, and must meet the design requirements. For heavy rocks that fail to meet the design requirements for 5m in a row, we should take timely remedial measures. When the hole is actually drilled into or out of the ore body, the apex angle and azimuth angle should be measured, and the hole depth and hole deviation should be calibrated. The distance between the actual location of the drilling location and the vertical line of the exploration should be determined according to the specific conditions of the deposit.
Sampling must be strictly Mucking Loading Machine standardized to avoid selective sampling, mixing, contamination, and misnumbering. For ores that are not easily identified or that may undergo mineralization, continuous sampling should be used. Different types of ore samples should be treated differently. The sampling of coal quality should be based on different coal types, the degree of change in the main coal quality indicators, and the industrial use of coal. Sand and mineral samples must be washed and weighed according to standards, and the total weight loss rate of metallic and non-metallic mineral samples should be controlled within 5%. And nationally recognized and qualified laboratory units are responsible for the analysis and inspection of samples. Internal and external samples must be coded by the sample transfer unit, but the samples should be sent to the original analysis unit for verification. External samples should be attached to the original analysis method and sent to a designated laboratory for external inspection.
Due to the current high demand for Mucking Loading Machine mineral resources in China, there are many challenges in geological mineral exploration.Therefore, it is necessary to study prospecting methods so that we can improve our existing geological and mineral exploration capabilities, so as to develop more mineral resources and make full use of information. Technology promotes the rapid and stable development of our economy. The geological conditions in China are complex. In order to improve mineral resources, especially deep mineral resources, how to mine mineral resources in an orderly manner and quickly explore them is a major challenge facing us. Therefore, we must combine science and technology, continue to develop and innovate, integrate various geological prospecting and exploration technologies, and overcome a single technology that restricts the passage of comprehensive transportation.