NOTICE:
Employment conditions
Rock mucking loader machine maintenance workers must undergo specialized technical training before they can pass the job; the maintenance workers must comply with the general requirements of electric fitters, be familiar with the structure of the rock loader and the power supply system of the mucking machine working surface, and master the intact standards of mechanical equipment. Grease management standards, safety technical standards, maintenance standards and regulations.
Mucking Machine Safety regulations
(1) It is necessary to check whether the mucking loading machine operation site is safe and whether the gas concentration meets the regulations so as to be unsafe and not operate. You must first cut off the power of the rock loader, lock the switch, and then perform maintenance work, and put on the "Someone is not allowed to send electricity" sign.
(2) The mucking machine should be maintained regularly. It includes:
1. Daily maintenance: Daily maintenance.
2. Regular maintenance: weekly or monthly maintenance.
3.Mid-term maintenance: once every six months.
4.Year-end maintenance: once a year.
Preparation before rock mucking loading machine operation
Before going down the well, you must check the operation records of the mucking loading machine, carefully listen to the introduction of the staff from the previous class, and have sufficient working equipment, common materials, spare parts, spare parts and construction protective supplies.
Finishing work
After the maintenance work of the rock mucking machine is completed, the working environment must be cleaned up, the tools and various materials, spare parts, spare parts, etc. left over, and the maintenance status of the rock mucking machine must be filled in the shift record.