NOTICE:
When the heading face was about to be completed, some trouble was killed on the way, and a fault appeared in the track trough.. In order to successfully pass the final "difficult moment", the most important link is to ensure the healthy operation of rock mucking loader production equipment.
In the pre shift analysis meeting, the technical personnel in charge, deputy team leader in charge of mechanical and electric mucking loading machine, assistant technician of mechanical and electrical maintenance team leader, etc. systematically summarized the causes of previous equipment failures and the current production situation, and worked out the "15 items of production equipment failure law analysis" after 4 days This paper analyzes the fault rules of eight kinds of production equipment, such as protection machine, air pump and rake loader, so as to effectively improve the ability of mechanical and electrical maintenance workers to predict and eliminate production mucking loading machine faults.
The high-speed shaft of the reducer can be replaced in time without any fault symptoms under the normal operation of the rake bucket mucking loading machine, which can ensure the sound operation of the equipment. All of these benefits from the "analysis of 15 production equipment failure rules". The worker took out a "white paper" from the kit. See the seventh fault law analysis, which reads: "the fault cycle of high-speed shaft of reducer is 45 days;
Wear and aging appear after the deadline. If gear oil and grease are not injected in time during normal work, serious wear will be caused in about one day. " This time, it can be replaced in time because the high-speed shaft has been running for 42 days. Finding out the law of equipment failure has undoubtedly become a "commandment" restricting rock mucking loading machine damage.