NOTICE:

Shandong China Coal Mucking Machine Co., Ltd. mainly produce mining equipment, such as mucking machine, rock loader, Mucking loader, Rock Mucking Loader, Tunnel Mucking Machine, Mucking Loading Machin
China Coal
Home>Details

The Important Role Of Shunting Disc In Mucking Loading Machine Accessories

The Important Role Of Shunting Disc In Mucking Loading Machine Accessories

It is very important to have a complete set of accessories for the scraper Mucking Loading Machine. Shandong Zhongmei Factory provides you with high-quality accessories. We have introduced a lot of knowledge about the accessories of the scraper Mucking Loading Machine. Now we have learned that the scraper Mucking Loading Machine is equipped with a mechanized shunting wheel. P. PD, YPD series scraper Mucking Loading Machine is mainly used for loading with tramcar or bucket in tunneling of coal mines, metallurgical mines, tunnels and other projects. The main machine of the scraper Mucking Loading Machine is driven by a planetary gear. This series of scraper Mucking Loading Machine has the characteristics of high Mucking Loading Machine efficiency, simple structure, good reliability, convenient operation, wide application range, etc. It can be used not only in the level roadway, but also in the inclined roadway below 30 °. Mucking Loading Machine is a major mechanical equipment to improve the excavation speed and realize the mechanization of roadway excavation.

The important accessories of the scraper Mucking Loading Machine are the mechanized shunting disc, which can speed up the shunting operation and better meet the requirements of large section waste discharge. When the shunting disc is removed, it can also be used as the P-type scraper Mucking Loading Machine. (A) Type I rake bucket machine is equipped with pneumatic trolley cylinder. After the wagon is full, the pneumatic trolley cylinder can be used to push out the heavy wagon, so as to reduce the labor intensity of workers, shorten the shunting time and improve the tunneling speed. The electrical equipment has explosion-proof performance and can be used in mines with coal dust and gas.

The chute is one of the very important accessories for the scraper Mucking Loading Machine. Select a good chute and go to Shandong Zhongmei to have a look. The material trough of the scraper rock loader includes a feeding trough, an intermediate trough and an unloading trough. The scraper Mucking Loading Machine is used to scrape the gangue through the scraper. The gangue scraped by the scraper is discharged to the ore car or skip along the feed chute, the middle chute (the middle is connected with the chute), and the discharge opening from the unloading chute to the unloading chute. The middle groove of the scraper Mucking Loading Machine is installed on the trolley and the pillar, and the feeding groove and unloading groove are firmly fastened on the flanges at the front and rear of the middle groove with bolts. A lifting device is installed in the middle of the feed chute of the scraper Mucking Loading Machine feed chute to adjust the height of the dustpan. Baffles are installed on both sides of the front of the dustpan to guide the scraper into the chute. There are two bending parts in the middle groove of the scraper Mucking Loading Machine. Considering the large wear, the removable wear-resistant arc plate is installed. The arc plate can be disassembled and replaced when it is worn to a certain extent. The shape of the middle groove depends on the position of the winch and winch. At the same time, it should also be considered that the rock will not slide down after entering the groove. When raking the rock, the steel wire rope should be less than the friction of the bottom groove plate. Therefore, the bottom plate of the groove is designed as a convex shape, so that the steel wire rope can only contact the convex layer. After wear, it will save labor and materials to replace the convex bottom plate. The unloading chute of the scraper Mucking Loading Machine is located at the bottom of the unloading chute, with a discharge opening. The scraper discharges through the discharged materials. A spring connector is installed at the rear of the chute, which acts as a buffer when it collides with the scraper.

CONTACT US

Telephone : +86-18660761375

Fax : +86-537-2486099

Address : No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China