What Are The Technical Measures To Ensure The Safety Of Rock Loader

The safety technical measures for the transportation of Mucking Machine are very important. There are many points of safety knowledge in the use of Mucking Machine, so you must remember them firmly. The following is the safety technical measures for Mucking Machine shipment summarized by Shandong Zhongmei Mucking Machine manufacturer.

1 The distance from Mucking Loading Machine to the bottom of the well shall not be less than 6m. The Mucking Loading Machine must be equipped with auxiliary lighting during operation.

2 The driver of the Mucking Loading Machine must hold a certificate. Before starting up, carefully check whether the Mucking Loading Machine is firmly fixed, whether the protective railings (made according to the mine standard) and the rope rails are complete and reliable (two on the operator's side and two on the other side, the lower end of the rope rails is firmly fixed with the body, and the upper end is connected to the top to form a seal). Check whether the handlebars and signals are flexible. If there is a problem, do not start up the machine.

3 The four rail clamps of the Mucking Loading Machine must be tightened, and the two waist ropes must be tightened effectively. The waist ropes must be tightened with four pairs of rope clips.
4 The area around the operation site of the Mucking Loading Machine driver shall be kept clean and free of live coal and debris.
5 The driver shall send a signal before starting the Tunnel Mucking Machine, and the machine can only be started after all personnel have evacuated to a safe place behind the machine.
6 The track used to fix the Mucking Loading Machine must be mounted with cleats, and the wires must be complete and effective.
7 When theMucking Loading Machine starts, no one is allowed in the roadway within the scope of scraper operation, nor is it allowed to touch or collide the running wire rope with hands or tools. The power must be cut off when the driver stops, and the switch must be turned to "zero" position and padlocked when the driver leaves the operation site.
8 No ballast is allowed to be stored in the body slot and the dustpan of the Mucking Loading Machine. In order to prevent the scraper from leaving the slot or dropping debris to hurt people.

9 When Tunnel Mucking Machine working, two handles shall be used at the same time, but the handle in the opposite direction shall be lightly pressed to prevent swinging of the wire rope from causing the bucket or flying bucket.

10 During operation, the Tunnel Mucking Machine lane shall be cleared from the front of the machine body, and then the loading range shall be gradually expanded forward to the working face.

11. Always pay attention to the sound of Tunnel Mucking Machine operation, and stop the Tunnel Mucking Machine immediately in case of any fault.
12. In the process of Tunnel Mucking Machine, if the drag of the scraper is too large, it is not allowed to drag it forcibly. The scraper should be backed up properly. After reducing the drag, the scraper should be towed again.