NOTICE:
The movement of the bucket rock mucking loading machine needs to comply with the rules for the movement of the bucket mucking machine in the roadway. The following is the detailed information of the second method of moving the bucket mucking loading machine in the roadway:
1. After firing the cannon, knock on the top first,
2. Before moving the rock mucking loading machine, clean the gangue on the loading square and on the track, and remove the gangue on both sides of the dustpan mouth (including the moving distance from both sides of the inner roadway)
3. After confirming the safety, lift the mucking loading machine mouth, hang the lifting hook firmly, and lift the dustpan mouth more than 50 mm from the bottom plate
4. Loosen the front and rear rail clamps, and move a little distance back (until the rail head is exposed to facilitate the connection to the rail, use wooden diagonal wedges to padded the front and back, nail the rail, then remove the cushion, push the mucking machine forward to the dustpan mouth to cover the rail The head, the rail clamp is fixed and the bucket mucking loading machine is fixed), the steel rail is connected, and the rake bucket mucking loader machine can also be moved manually in the roadway. The moving speed should be uniform and not too fast.
5. After the bucket rock mucking loading machine moves to the predetermined position, first fix the 4 rail clamps, and lay the anchors and the rear support legs.